My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_PERMIT FILE - C1981008A (14)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2018-09-11_PERMIT FILE - C1981008A (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 8:49:59 AM
Creation date
10/4/2018 9:23:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
9/11/2018
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 42 of 135 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on 31.68 ac Morgan property Zone 3 <br />Site: New Horizon Mine Permit Action: RN7 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30B State: Colorado Abbreviation: None <br />Date: 12/28/2017 County: Montrose Filename: C008 -30B <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />-Scraper: <br />-Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cad Rreakdnwn: <br />Scraner Wnrk Team <br />COSTShift basis: 1 per day <br />;auinment Description <br />Cat 631G <br />Cat D9T - 9SU <br />NA <br />NA <br />CAT 14M <br />Water Tanker, 5,000 Gal. <br />Snnnnrt Frminment <br />Maintenance Fnninment <br />Total work team cost/hour: $1,560.17 <br />MATERIAL OUANTITIES <br />Initial volume: 370,550 CCY Swell factor: 1.100 <br />Loose volume: 407,605 LCY <br />Source of estimated volume: Map 2.05.4-6, 54"A/B, 33" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$98.72 <br />$100.59 <br />NA <br />NA <br />$54.68 <br />$24.01 <br />Operating cost/hour: <br />$108.19 <br />$87.23 <br />NA <br />NA <br />$23.50 <br />$17.07 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />$41.85 <br />NA <br />NA <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$238.17 <br />$229.67 <br />NA <br />NA <br />$107.07 <br />$41.08 <br />Number of Units: <br />4 <br />2 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,412.02 <br />Support: <br />$0.00 <br />Maint: <br />$148.15 <br />Total work team cost/hour: $1,560.17 <br />MATERIAL OUANTITIES <br />Initial volume: 370,550 CCY Swell factor: 1.100 <br />Loose volume: 407,605 LCY <br />Source of estimated volume: Map 2.05.4-6, 54"A/B, 33" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.