My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_PERMIT FILE - C1981008A (14)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2018-09-11_PERMIT FILE - C1981008A (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 8:49:59 AM
Creation date
10/4/2018 9:23:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
9/11/2018
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 24 of 135 <br />MOTOR GRADER WORK <br />Task description: Final rade disturbed areas (not bond released) <br />Site: New Horizon Mine Permit Action: RN7 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: Colorado <br />Date: 12/28/2017 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Abbreviation: None <br />Filename: C008-009 <br />Horsepower: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />mph <br />blading (0-6 mph) - 3.25 <br />0 <br />degrees <br />14.00 <br />Utilization % <br />Ownership Cost/Hour: <br />$54.68 <br />NA <br />Operating Cost/Hour: <br />$46.99 <br />100 <br />Ripper Ownership Cost/Hour: <br />$0.00 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Operator Cost/Hour: <br />$28.90 <br />NA <br />Total Unit Cost/Hour: <br />$130.57 <br />Total Fleet Cost/Hour: $130.57 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />360.80 <br />Source of estimated acreage: SL -16 App: 468.6 disturbed ac less 107.8 ac <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />259 <br />1 per day <br />(CRG) <br />acres <br />3.25 <br />Heavy <br />mph <br />blading (0-6 mph) - 3.25 <br />0 <br />degrees <br />14.00 <br />feet <br />2.00 <br />feet <br />12.00 <br />feet <br />4.7273 <br />acres/hour <br />Site Altitude: 5700 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 4.2545 acres/Hour <br />Adjusted Hourly Fleet Production: 4.2545 acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 84.80 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.