Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 20 of 135 <br />BULLDOZER WORK <br />Task description: Grade spoil side of pit ramp <br />Site: New Horizon Mine Permit Action: RN7 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 12/28/2017 County: Montrose Filename: C008-007 <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />OBSOLETE- Cat D9T - 9U <br />Horsepower: <br />405 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$95.80 <br />Utilization % <br />NA <br />$111.03 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />$248.68 <br />$49735 <br />MATERIAL QUANTITIES <br />Initial Volume: 81,639 <br />Swell factor: 1.000 <br />Loose volume: 81,639 LCY <br />Source of estimated volume: Mau 3.02.2-5 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />952.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push <br />gradient: <br />Average site altitude: <br />-20% <br />5.700 feet <br />Material weight: 2,900 lbs/LCY <br />CIRCES Cost Estimating Software <br />