Laserfiche WebLink
Page 16 of 135 <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />Truck Load Time: 1.585 Minutes Adjusted for site altitude: 1.585 Minutes <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 4000.00 <br />-1.30 3.00 <br />1.70 <br />3448 <br />1.655 <br />2 10000.00 <br />-1.30 3.00 <br />1.70 <br />3448 <br />2.900 <br />Haul Time: 4.555 minutes <br />Return Route: <br />Seg # Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 10000.00 <br />1.30 3.00 <br />4.30 <br />3540 <br />3.087 <br />2 4000.00 <br />1.30 3.00 <br />4.30 <br />3540 <br />1.130 <br />Return Time: 4.217 <br />Total Truck Cycle Time: 12.157 <br />Loading Tool unit <br />Production 1,062.93 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />199.79 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 5 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 663.29 <br />Adjusted single truck/loader team production: 663.29 <br />Adjusted multiple truck/loader team production: 663.29 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.358 /LCY <br />_ minutes <br />minutes <br />882.23 LCY/Hour <br />165.82 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 139.68 Hours <br />Total job cost: $218,464 <br />CIRCES Cost Estunating Software <br />