Laserfiche WebLink
Table of Contents <br />Section 2.05.4(2)(c) <br />Backfill and Grading <br />Backfilling and Grading.............................................................................................. <br />2.05.4(2)(c)-1 <br />Backfilling and Grading Methods........................................................................2.05.4(2)(c)-1 <br />General Grading Requirements............................................................................. <br />2.05.4(2)(c)-2 <br />Final Graded Slopes........................................................................................2.05.4(2)(c)-1 <br />Terraces........................................................................................................... <br />2.05.4(2)(c)-1 <br />Small Depressions...........................................................................................2.05.4(2)(c)-1 <br />SteepSlopes....................................................................................................2.05.4(2)(c)-1 <br />Final Grading.................................................................................................. <br />2.05.4(2)(c)-2 <br />Final Pit Backfilling........................................................................................ <br />2.05.4(2)(c)-2 <br />Western Mining Area Backfilling................................................................... <br />2.05.4(2)(c)-2 <br />Special Handling of Bench 1 Overburden on Morgan Prime Farmland......... <br />2.05.4(2)(c)-4 <br />Thin and Thick Overburden.................................................................................. <br />2.05.4(2)(c)-4 <br />Disposal of Excess Spoil...................................................................................... <br />2.05.4(2)(c)-5 <br />PostminingTopography........................................................................................ <br />2.05.4(2)(c)-5 <br />Slides and Other Damage...................................................................................... <br />2.05.4(2)(c)-6 <br />Postmining Pond Retention................................................................................... <br />2.05.4(2)(c)-6 <br />Postmining Roads................................................................................................. <br />2.05.4(2)(c)-6 <br />Postmining Drainage Channels............................................................................. <br />2.05.4(2)(c)-6 <br />Morgan Property Grading..................................................................................... <br />2.05.4(2)(c)-7 <br />List of Tables <br />Table 2.05.4(2)(c)-1: ERMR Property Topography Properties .................................. 2.05.4(2)(c)-3 <br />List of Attachments <br />Attachment 2.05.4(2)(c)-1: Reclaimed Krill Drainage Channel Design <br />Attachment 2.05.4(2)(c)-2: Reclaimed Krill Drainage Channel Design West Lateral <br />Attachment 2.05.4(2)(c)-3: Reclaimed San Miguel Power Drainage Channel Design <br />Attachment 2.05.4(2)(c)-4: Modification to Number of Stock Ponds Left on Burbridge Property <br />Attachment 2.05.4(2)(c)-5: San Miguel Power Letter Dated 20 September 2002 <br />Attachment 2.05.4(2)(c)-6: San Miguel Power Letter Dated 17 June 1998 <br />Attachment 2.05.4(2)(c)-7: Post Mine Overburden and Backfill Balance Table <br />List of Maps <br />Map 2.05.4-1 Postmining Topography <br />Map 2.05.4-1-3 Morgan Property Pre Mine to Post Mine Topography Comparison <br />Revised July 2018 (TR -84) <br />