Laserfiche WebLink
�`- , 1 RECEIVED <br /> OCT 0 3 L018 <br /> Maas and Exhibits: DIVISION OF RECLAMATION <br /> MINING AND$AF�y <br /> Two(2)complete,unbound application packages must be submitted. One complete application package consists of a sign9 application <br /> form and the set of maps and exhibits referenced below as Exhibits A-S,Addendum 1,and the Geotechnical Stability Exhibit. Each exhibit <br /> within the application must be presented as a separate section. Begin each exhibit on a new page. Pages should be numbered consecutively <br /> for ease of reference. If separate documents are used as appendices,please reference these by name in the exhibit. <br /> With each of the two (2) signed application forms, you must submit a corresponding set of the maps and exhibits as described in the <br /> following references to Rule 6.4,6.5,and 1.6.2(1)(b): <br /> EXHIBIT A Legal Description <br /> EXHIBIT B Index Map <br /> EXHIBIT C Pre-Mining and Mining Plan Map(s)of Affected Lands <br /> EXHIBIT D Mining Plan <br /> EXHIBIT E Reclamation Plan <br /> EXHIBIT F Reclamation Plan Map <br /> EXHIBIT G Water Information <br /> EXHIBIT H Wildlife Information <br /> EXHIBIT I Soils Information <br /> EXHIBIT J Vegetation Information <br /> EXHIBIT K Climate Information <br /> EXHIBIT L Reclamation Costs <br /> EXHIBIT M Other Permits and Licenses <br /> EXHIBIT N Source of Legal Right-To-Enter <br /> EXHIBIT O Owners of Record of Affected Land(Surface Area)and Owners of Substance to be Mined <br /> EXHIBIT P Municipalities Within Two Miles <br /> EXHIBIT Q Proof of Mailing of Notices to County Commissioners and Conservation District <br /> EXHIBIT R Proof of Filing with County Clerk or Recorder <br /> EXHIBIT S Permanent Man-Made Structures <br /> Rule 1.6.2(1)(b) ADDENDUM 1 -Notice Requirements(sample enclosed) <br /> Rule 6.5 Geotechnical Stability Exhibit(any required sections) <br /> The instructions for preparing Exhibits A-S,Addendum 1,and Geotechnical Stability Exhibit are specified under Rule 6.4 and 6.5 and <br /> Rule 1.6.2(1)(b)of the Rules and Regulations. If you have any questions on preparing the Exhibits or content of the information required, <br /> or would like to schedule a pre-application meeting you may contact the Office at 303-866-3567. <br /> Responsibilities as a Permittee: <br /> Upon application approval and permit issuance,this application becomes a legally binding document. Therefore,there are a <br /> number of important requirements which you,as a permittee, should fully understand. These requirements are listed below. <br /> Please read and initial each requirement,in the space provided,to acknowledge that you understand your obligations. If you <br /> do not understand these obligations then please contact this Office for a full explanation. <br /> 1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume legal <br /> liability for all reasonable expenses which the Board or the Office may incur to reclaim the affected lands <br /> associated with your mining operation in the event your permit is revoked and financial warranty is forfeited; <br />