Laserfiche WebLink
EXHIBIT D—Reclamation Plan <br /> The primary reclamation plan for the pit is to slope all areas at a slope no steeper than <br /> 3:1. The entire pit area will then have topsoil replaced,then be seeded according to <br /> recommendations received from the Sedgwick County Natural Resource Conservation <br /> Service. <br /> a) The pit area has topsoil averaging 4" in depth. That topsoil will be stockpiled <br /> and returned during the reclamation process. <br /> b) Slopes no greater than 3:1 will be left in the completed pit. <br /> c) There are no other reclamation treatments to note for this site. <br /> A cost estimate for final reclamation has been not been prepared since this pit is operated <br /> by a municipal government. <br /> EXHIBIT E—Maps <br /> Location Map <br /> USGS Quad Map <br /> Aerial Photo <br /> Site Map <br /> Mining Plan Map <br /> Reclamation Plan Map <br /> Final Contour Plan <br />