Laserfiche WebLink
Specifically, the June 29, 2018 map that Mountain Coal submitted to DRMS shows that <br />the mine's operations would increase the road mileage areas through Forest Service lands for <br />exploration and make less use of private land. Since the permit application was submitted, <br />Mountain Coal significantly expanded its proposed acreage and number of panels. Specifically, <br />the March 19, 2018 map reflects: 3 total panels, disturbed acreage of 40 acres, affected area <br />estimation of an increase of 630 acres (350 federal, 18 within the current permit area), 4.8 miles <br />of roads through forest land, and 25 mine -ventilation pads to drain methane. <br />RAIL <br />TRAIL <br />,a% 9f a <br />s- <br />I <br />OLO ROAp�'a <br />r 3-3 <br />- <br />I <br />._JT - 7 <br />C-3362 <br />Q Potential Connector <br />X Unnecessary Road ti tea.._ - ---- --` <br />Figure 3- Proposed MVB Pads and Roads- PR 15, 3/22/2018 <br />11 <br />COC <br />raal M1.oe seems sm-s� .�, sn mea; <br />S.e MLpil Iw Nn»�gmea Ipig�ll <br />m Egb�.6si [oM�em.s of <br />m�rcM1 mss <br />Mar�Ynfn[aol Campxo� <br />