Laserfiche WebLink
1 <br /> Mining Timetable <br /> The continuing uncertainty of ec�,.iomic conditions in the <br /> construction materials industry preriudes an accurate forecast of <br /> demand for materials-- during the life of the mine . We therefore, <br /> can only estimate the mining timetable based on an average year <br /> and may expect a specific year to vary widely from the average . <br /> TABLE D-1: MINING STAGES (revised 9/21/2018) <br /> Stage Name Total Mined Estimated <br /> Acreage Acreage Duration of <br /> Mining (years) <br /> Fort Lupton Sand and Gravel <br /> Parker-Panowicz 43 .51 22 .74 1 - 2 <br /> Swingle North 42 .02 33 .48 2 - 3 <br /> Fort Lupton West 47.81 42 .45 4 - 1.5 <br /> Swingle South 67.45 53 .10 2.5 - 3 <br /> Deep Lake 7.97 5.75 Complete <br /> Blue Ribbon 55.62 36 .11 2 - 3 <br /> Sandstead 58.85 36 .64 1 - 2 <br /> Vincent West 86.72 65.29 3 - 4 <br /> Parker-Adams 72.92 46 .63 2 - 3 <br /> Parker #1 43 .17 21.91 1 - 1.5 <br /> Funakoshi 46.83 30.66 1 - 2 <br /> Parker #2 33 .27 25 .86 1 - 2 <br /> Parker #3 43 .12 27.41 1 - 2 <br /> Parker #4 1 56.94 1 44 .27 1 2 - 3 <br /> TOTALS 706 .20 1 492 .30 1 26 - 39 <br />