Laserfiche WebLink
Exhibit L <br /> Peters 313 Reclamation Costs <br /> See the attached mine reclamation map(Exhibit F)showing the proposed gradient of all disturbed <br /> slopes and the location of revegetation areas. It is anticipated that no ponds will be constructed or <br /> remain on site. The average thickness of overburden is minimal; however, overburden and excavated <br /> soil materials unsuitable for road construction will be use to backfill excavated areas and for site re- <br /> grading to stable slopes. Stockpiled topsoil will be placed on re-graded areas prior to re-seeding with <br /> approved plant type seed mixes. Final site reclamation costs include the cost of native dry land grass <br /> seed and mulch application. <br /> The mining plan includes concurrent regrading of mined areas. It is anticipated that final grading and <br /> placement of topsoil from on-site stockpiles,followed by re-seeding,will cost approximately$210,000. <br /> No financial warranty is required because Weld County is a County entity. A written guarantee will be <br /> provided stating that the affected lands will be reclaimed in accordance with the terms of the permit. <br />