My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-25_REVISION - M2015045
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015045
>
2018-09-25_REVISION - M2015045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:14:14 AM
Creation date
9/26/2018 12:31:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015045
IBM Index Class Name
REVISION
Doc Date
9/25/2018
Doc Name
Request For Amendment To Permit
From
Weld County
To
DRMS
Type & Sequence
AM1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Canada thistle will be sprayed with Milestone at 7 oz/ac or Tordon 22K at 32 oz/ac when <br /> the plant is 6 to 10 inches tall up to the bud stage and/or in the fall as needed. <br /> ii. Field bindweed will be sprayed with Perspective at 5 oz/ac or Tordon 22K and 2,41) each <br /> at 32 oz/ac when the plant is in the flower stage and/or in the fall as needed. <br /> iii. Dalmatian toadflax will be sprayed with Tordon at 32 oz/ac and Telar at 2 oz/ac in the <br /> early flower stage and/or in the fall as needed. <br /> iv. Diffuse knapweed will be sprayed with Milestone at 7 oz/acre or Tordon 22 K and 2,4-D each at <br /> 32 oz/ac when the plant is in the rosette to early bolting stage. <br /> iv. If needed, one or two mowing treatments per year may be utilized to help suppress other <br /> vegetation that may compete with grass establishment in the disturbed areas outside of <br /> the areas that are returned to cropland. <br /> v. The property will be monitored once a month from May through October, providing <br /> adequate time to implement the spraying program as described above. <br /> Fertilizers: <br /> No fertilizers will be used. <br /> Trees and Shrubs: <br /> No trees, shrubs, or forbs will be planted. <br /> Topsoil Replacement: <br /> Topsoil will be stockpiled around the perimeter of the permit area, as shown on the mine plan <br /> map (see Exhibit C2). Piles will be seeded to prevent erosion and loss of soil. Topsoil will be <br /> replaced in a thicknesses equal to or exceeding (minimum 4 inches) the original topsoil depths <br /> found at the site. <br /> Reclamation, backfill, and seeding estimated costs: <br /> Approximately$210,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.