Laserfiche WebLink
i. Canada thistle will be sprayed with Milestone at 7 oz/ac or Tordon 22K at 32 oz/ac when <br /> the plant is 6 to 10 inches tall up to the bud stage and/or in the fall as needed. <br /> ii. Field bindweed will be sprayed with Perspective at 5 oz/ac or Tordon 22K and 2,41) each <br /> at 32 oz/ac when the plant is in the flower stage and/or in the fall as needed. <br /> iii. Dalmatian toadflax will be sprayed with Tordon at 32 oz/ac and Telar at 2 oz/ac in the <br /> early flower stage and/or in the fall as needed. <br /> iv. Diffuse knapweed will be sprayed with Milestone at 7 oz/acre or Tordon 22 K and 2,4-D each at <br /> 32 oz/ac when the plant is in the rosette to early bolting stage. <br /> iv. If needed, one or two mowing treatments per year may be utilized to help suppress other <br /> vegetation that may compete with grass establishment in the disturbed areas outside of <br /> the areas that are returned to cropland. <br /> v. The property will be monitored once a month from May through October, providing <br /> adequate time to implement the spraying program as described above. <br /> Fertilizers: <br /> No fertilizers will be used. <br /> Trees and Shrubs: <br /> No trees, shrubs, or forbs will be planted. <br /> Topsoil Replacement: <br /> Topsoil will be stockpiled around the perimeter of the permit area, as shown on the mine plan <br /> map (see Exhibit C2). Piles will be seeded to prevent erosion and loss of soil. Topsoil will be <br /> replaced in a thicknesses equal to or exceeding (minimum 4 inches) the original topsoil depths <br /> found at the site. <br /> Reclamation, backfill, and seeding estimated costs: <br /> Approximately$210,000 <br />