Laserfiche WebLink
<br /> <br /> <br /> <br /> 9 <br />appropriation date of Jun 30, 1963. Water Division No. 5, Case No. W-2980 granted the No. 3 <br />Mine a water right for 21 gpm with an appropriation date of December 31, 1962. <br /> <br />A plan for backfilling the No. 1 Mine portal was approved with Technical Revision No. 20 on <br />October 1, 1998. The Division's inspection of October 26, 1998 confirmed that the Mine No. 1 <br />main adit and ventilation shaft adit were backfilled, graded and topsoiled. <br /> <br />The final reclamation of the loadout area included grading and backfilling the disturbed areas. <br />The area was returned to its approximate original contour and restored to support agricultural <br />production. The loadout area reclamation was completed in 1987. <br /> <br />The main portion of the loadout was located north and east of the Roaring Fork River on land <br />known as the Diamond A parcel. The Diamond A Parcel was removed from the permit by <br />Division approval of TR-15 on February 1, 1994.