My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-24_PERMIT FILE - C1981010
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2018-08-24_PERMIT FILE - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 12:43:20 PM
Creation date
9/26/2018 9:24:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
8/24/2018
Doc Name
Annual Reclamation Report
Section_Exhibit Name
Appendix W 2017 Report Section 1.0 to 7.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mature Shrub Transplant Clumos <br />In 2017, no shrub clumps were constructed. Three new shrub clump is proposed for <br />construction in 2018. <br />Drainage Reconstruction <br />Refer to Section 3.0 of this annual report. <br />Contour Ditch Construction <br />During 2017, Trapper did not construct any contour ditches. <br />Stock Tank Construction <br />No new Stock Tanks were constructed during the 2017 field season. Refer to Section 6. <br />Stock Tank Reclamation <br />No Stock Tanks were reclaimed during the 2017 field season. Refer to Section 6. <br />Developmental Drill Sites <br />During the 2017 Developmental Drilling season fifteen holes were drilled within the permit <br />boundary in the I, J and L pit areas. All applicable developmental drill holes were abandoned <br />per permit section 3.3.2 and will be reclaimed and seeded per section 3.6.3.5 of the permit. Drill <br />hole abandonment typically uses Alternative 2 for sealing of the borehole. <br />Topsoil Piles <br />Topsoil taken from piles 9MZ3, K2-15 and G1-02 was used as follows. Portions of topsoil from <br />G1-02 was used for reclamation in the areas of Z -A-17 and also stockpiled for later use due to <br />pit advancement into L2-17, L3-17 and L5-17 piles. Topsoil from 9MZ3 and K2-15 piles were <br />used for laydown in Z -A-17 reclamation area. Refer to Section 5. <br />Sediment Dams <br />Pond cleaning during 2017, East Middle Flume #1, Middle Flume #3 and Oak #1. <br />1.2.6 Previously Revegetated Acres <br />The locations and acres for all previously revegetated areas, seeded to perennial species, are <br />presented in Map(s) 1. To date, Trapper has revegetated approximately 4,216.3 acres <br />including the 44.0 acres in 2017 within the boundaries of active mining and has revegetated an <br />additional 516.0 acres within the permit boundary but outside active mining areas or topsoil <br />stripping limits. Of the total revegetated acres 3,690.8 reclaimed acres have received final <br />phase III bond release. Total life of reclamation is 4,732.3 acres. <br />Not shown on Map(s) 1 in this annual report are the areas seeded to temporary perennial mixes <br />that will require final reclamation prior to the end of the project (life of mine). r►�¢�w�`� <br />1.2.7 Re -Disturbed Reclamation Acres <br />The parcel identification and acres re -disturbed due to mining activities for all previously <br />revegetated areas will be documented here. Table 1.2 will show acres re -disturbed and <br />summarize the bond release status of each parcel. No previously reclaimed acres were re - <br />disturbed in 2017. <br />FVL/BDN/GCR 3/18 <br />[DRMS\17RECtext1-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.