Laserfiche WebLink
SECTION 5.0 Topsoil Stockpile Locations <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br />the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br />stockpiles proposed for construction during the upcoming year (Map 1). <br />Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br />During 2017, Trapper depleted topsoil piles G1-02 and 9MZ3 for reclamation of parcels Z -A-17. In <br />preparation of pit advancement a portion of topsoil from G1-02 was placed in three piles, 1-2-17, 1-3-17 <br />and 1-5-17 for later use. <br />At the end of 2017, excluding stockpiles abandoned with the approvals of MR -155 and TR -94, there are <br />59 existing topsoil stockpiles at Trapper affecting 155.8 acres and storing approximately 3,269,950 cubic <br />yards of salvaged topsoil. <br />Presently there are no proposed approximate locations for new topsoil stockpiles in 2018. Trapper is <br />planning to utilize existing topsoil stockpiles and live haul stripping for the 2018 reclamation season. <br />GCR/BDN 3/18 <br />[Annual Report\DRMS17RPT\17TStext5-0] <br />