My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-24_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2018-09-24_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 11:49:56 AM
Creation date
9/26/2018 6:52:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/24/2018
Doc Name
Adequacy Review
From
DRMS
To
Mountain Coal Company, LLC
Type & Sequence
TR146
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Reclaim LWE14 MVB pads and roads <br />Site: West Elk Mine Permit Action: Tr146 Permit/Job#: C1980007 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 9/24/2018 County: Gunnison Filename: C007-000 <br />User: LDS <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />01a LWE14 MVBs: plug and seal BOREHOLE 1 14.00 $4,081.61 <br />01b Pads and roads E14-1 through -3: regrade DOZER 1 34.04 $7,096.00 <br />01c Pads and roads E14-1 through -3: topsoil DOZER 1 16.50 $3,440.00 <br />01d Pads and roads E14-1 thru -3: broadcast PRD mt <br />shrb seed mx <br />REVEGE 1 9.80 $5,512.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />74.34 <br /> <br />$20,130 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $406.63 <br />Performance bond: 1.05 Total = $211.37 <br />Job superintendent: 37.17 Total = $2,715.27 <br />Profit: 10.00 Total = $2,013.00 <br /> TOTAL O & P = $5,346.27 <br /> CONTRACT AMOUNT (direct + O & P) = $25,476.27 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.00 Total = $1,019.05 <br />Reclamation management and/or administration: 3.13 $797.41 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $7,162.73 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $27,292.73 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.