Laserfiche WebLink
September 18, 2018 C-2010-088/Fruita Loadout CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 2 of 5 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />R - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br /> <br />Y - Roads <br />N - Reclamation Success <br />N - Revegetation <br />N - Subsidence <br />N - Slides and Other Damage <br />N - Support Facilities On-site <br />R - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a complete inspection of the Fruita Loadout conducted on September 18, 2018. The inspection was <br />completed by Clayton Wein of the Division of Reclamatio, Mining and Safety (the Division). The site is inactive, <br />Therefore, no company representative was presen t for the inspection. The weather was clear and about 97 degrees <br />F. The ground conditions wee dry. <br />AVAILABILITY OF RECORDS – Rule 5.02.4(1): <br /> The records for the Fruita Loadout are located at the offices of J.E. Stover and Associates in Grand <br />Junction, Colorado. The records were well kept and in good condition. Please see the Availability of Records <br />form attached to the end of this report for more details . The records check for the site was completed on <br />September 19, 2018. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> There has been no disturbances created at the loadout site (Photo 1). No off site impacts were observed. <br />During the inspection there were no indications of erosion. Reed w ash was flowing at the time of the inspection <br />(Photo 2).