My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-25_REVISION - M2014043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014043
>
2018-09-25_REVISION - M2014043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:09:01 AM
Creation date
9/25/2018 3:01:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
REVISION
Doc Date
9/25/2018
Doc Name
Request for Technical Revision
From
DRMS
To
Albert Frei & Sons
Type & Sequence
TR1
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-REVISED AUGUST 2018 <br /> Frei Hatchery Pit(DMG Permit No. M-2014-043) <br /> SWSP Water Budget and Accounting Form <br /> (all values k1 acre-feet,unless othenarlse noted) <br /> (1) (2) (3) r4) (`) (6) rya) (7) (a) (9) (10) (Ili (12) (13) (14) <br /> DEPLETIONS REPLACEMENTS <br /> Excavation Evaporation Pumping <br /> Month Soil Total Lagged <br /> Volume Moisture Acres Net Ev Dust Dewater Depletions Depletion %Month Replacement Metro Effluent Transit Loss Net Metro Balance <br /> Tons Content Evaporation Depletion Controlw/Call Requirement Lease Accretions <br /> Oct-17 52.500 1.16 1.00 0.30 0.30 0.07 1.53 -1.13 100% -1.13 1.17 0.040 1.13 0.00 <br /> Nov-17 39.000 0.86 1.00 0.20 0.20 0.02 1.08 -1.02 100% -1.02 1.04 0.018 1.02 0.00 <br /> Dec-17 39,000 0.86 1.00 0.09 0.09 0.02 0.97 -0.92 100% -0.92 0.94 0.016 0.92 0.00 <br /> Jarr18 39,000 0.86 1.00 0.08 0.08 0.02 0.96 -0.91 100% -0.91 0.92 0.016 0.91 0.00 <br /> Feb-18 39,000 0.86 1.00 0.08 0.08 0.02 0.96 -0.91 100% -0.91 0.93 0.016 0.91 0.00 <br /> Mar-18 39,000 0.86 1.00 0.10 0.10 0.02 0.98 -0.93 100% -0.93 0.95 0.016 0.93 0.00 <br /> Apr-18 75,000 1.66 1.00 0.12 0.12 0.10 1.88 -1.60 100% -1.60 1.66 0.056 1.60 0.00 <br /> May-18 82,500 1.82 1.00 0.22 0.22 0.11 2.16 -1.94 100% -1.94 2.00 0.068 1.94 0.00 <br /> Jun-18 90,000 1.99 1.00 0.28 0.28 0.20 2.47 -2.24 100% -2.24 2.32 0.079 2.24 0.00 <br /> Jul-18 90.000 1.32 1.00 0.42 0.42 0.20 1.95 -1.92 100% -1.92 1.99 0.068 1.92 0.00 <br /> Aug-18 90,000 1.32 1.00 0.45 0.45 0.12 1.89 -1.83 100% -1.83 1.89 0.064 1.83 0.00 <br /> Sep-18 75,000 1.10 1.00 0.39 0.39 0.10 4.09 1.59 -4.62 100% -0.53 1.66 0.056 1,60 1.07 <br /> Total 750.000 14.68i 2.75 2.75 1.00 4.09 1 18.43 -19.96 1 1 -15.87 17.45 0.512 ' 16.94 1 1.07 <br /> Oct-18 52,500 0.77 1.00 0.30 0.30 0,07 2.86 1.14 -3.93 100% -1.07 1.27 0.043 1.23 0.15 <br /> Nov-18 39,000 0.57 1.00 0.20 0.20 0.02 2.13 0.80 -3.01 100% -0.88 0.92 0,016 0.90 0.02 <br /> Dec-18 39,000 0.57 1.00 0.09 0.09 0.02 2.13 0.69 -2.78 100% -0.65 0.77 0.013 0.75 0.10 <br /> Jarr19 39,000 0.57 1.00 0.08 0.08 0.02 2.13 0.67 -2.74 100% -0.61 0.72 0.012 0.71 0.10 <br /> Feb-19 39,000 0.57 1.00 0.08 0,08 0.02 2.13 0.67 -2.73 100% -0.60 0.71 0.012 0.70 0.10 <br /> Mar-19 39,000 0.57 1.00 0.10 0.10 0.02 2.13 0.70 -2.74 100% -0.62 0.72 0.012 0.71 0.09 <br /> Apr-19 75,000 1.10 1.00 0.12 0.12 0.10 4.09 1.33 -4.66 100% -0.57 1.21 0.041 1.17 0.60 <br /> May-19 82,500 1.21 1.00 0.22 0.22 0.11 4.50 1.55 -5.51 100% -1.01 1.47 0.050 1.42 0.42 <br /> Jurr19 90,000 1.32 1.00 0.28 0.28 0.20 4.91 1.81 -6.17 100% -1.26 1.72 0.059 1.66 0.40 <br /> Jul-19 90,000 1.32 1.00 0.42 0.42 0.20 4.91 1.95 -6.43 100% -1.52 1.88 0.064 1.62 0.30 <br /> Aug-19 90,000 1.32 1.00 0.45 0.45 0.12 4.91 1.89 -6.47 100% -1.56 1.88 0.064 1.81 0.26 <br /> Se -19 75,000 1.10 1.00 0.39 0.39 0.10 4.09 1.59 -5.67 100% -1.58 1.65 0.056 1.60 0.01 <br /> Total 750 000 11.04 2.75 2,75 1.00 40.91 1 14.78 1 -52.84 1 1 -11.93 - 14,92 0,442 1 14.48 <br /> TOTAL 1.5M tons 25.72 5.50 2.00 45.00 1 33.21 1 -72.80 -27.80 32.37 1 31.42 1 3.62 <br /> Notes' <br /> 1.750000 tons excavated each yearforthree years.Distributed monthly based on projected production schedule through May 2019. <br /> 2.Material on site estimated as-1/2 below and-1/2 above water table,therefore,3.0%moisture content. <br /> 3 Exposed post-1981 surface area. <br /> 4.Based on gross evaporation(43 In.from NOAA NWS-33)distributed monthly per SB-120 for elevations less than 6,500'minus 70%of avg precip.for Brighton weather station. <br /> 5.Equal to(2)'(3). <br /> 6.1 ac-ft annual use of water pumped from pit.Distributed based on typical production schedule. <br /> 6a.45 ac-ft total dewatering from Phase It during Oct 2018-Sep 2019.Distributed based on typical production schedule <br /> 7 Equal to(2)+(5)+(6). <br /> B.Total mining tlepletions 1(6)+(6a)]lagged to over with monthly lagging factors for site based on Glover Anaysis using D=350 R.,SS=0.2,Db=12900 ft.,T=87000 gpdn.alpha=L 16 <br /> 9.Portion of month with active call placed downstream of pit,assumed 100%for planning purposes.SWSP accounting will be based on actual call recorded by Water Division 1 office. <br /> 10.Equal to I(8)-(9)+(6a)]a 0 <br /> 11 and 11 a.Reusable effluent delivered from Metro WWTP pursuant to lease with City of Aurora. <br /> 12.Transit loss of 0.5%summer(0.25%winter)per mile over 6.8 over miles down to Bull Seep discharge near McKay Road bridge. <br /> 13.Equal to(11)-(12). <br /> 14.Equal to(10)+(13)+max 10.(8)'(9)+(6a)I.Positive values indicate accretions to over N egative values indicate depletions to rrver. <br /> ParsonsWater Consulting, LLC 1619 Minear Road,Medford,OR 97501 303.667.5067 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.