My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-25_REVISION - M2014043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014043
>
2018-09-25_REVISION - M2014043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:09:01 AM
Creation date
9/25/2018 3:01:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
REVISION
Doc Date
9/25/2018
Doc Name
Request for Technical Revision
From
DRMS
To
Albert Frei & Sons
Type & Sequence
TR1
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF C0z <br /> *e. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> y � <br /> 187 <br /> " * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION JR) COVER SHEET SEP <br /> File No.: M- M-2014-043 Site Name: Hatche Pit �NOF!'FcLA)Warr <br /> County Adams TR# (DRMS Use only) <br /> Permittee: Albert Frei and Sons, Inc. <br /> 3 CA <br /> Operator (If Other than Permittee): TROI <br /> o CD <br /> `e z <br /> Permittee Representative: Ben Frei m <br /> x <br /> m <br /> Please provide a brief description of the proposed revision: <br /> IMD <br /> Request to change from installing a slurry wall around Stage 2 to installing a compacted fill 3 <br /> liner and change the direction of mining in Stage 2. Also minor revision to fill in part of the <br /> Pre-1981 lake in Stage 1. The attached text and maps explain and show the changes in detail. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, m 3 I� <br /> the Division may require the submittal of a permit amendment to make the required or desired changes o <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction materials, and 112 quarries $216 `� <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.