Laserfiche WebLink
OURAY 5/Ll FR AII/NE5 <br /> The signed and dated version of Map 1 discussed in item 3 above also contains the <br /> location for the new monitoring well GW-4, located between pond#3 of the Five Stage <br /> Passive Treatment System and Sneffels Creek. <br /> While every attempt has been made to provide a thorough response, OSMI requests an extension of two <br /> weeks (until Oct. 11, 2018) if this response does not adequately address DRMS concerns. Please do not <br /> hesitate to call me with concerns or questions at 970-325-9830. <br /> Sincerely, <br /> Brian K. Briggs PE <br /> CEO, Ouray Silver Mines Inc. <br /> Attachments: <br /> Figure 1. Pond#1 (Mine Water Pond) & Pond#2 Plan and Profile <br /> Figure 2. Pond#3 Plan and Profile <br /> Figure 3. Details <br /> Figure 4. Area Capacity Curve Pond#1 (Mine Water Pond) <br /> Figure 5. Area Capacity Curve Pond#2 <br /> Figure 6. Area Capacity Curve Pond#3 <br /> Map 1. Site Map with proposed changes. <br /> 2 Page <br />