Laserfiche WebLink
NeWm9MUEF <br /> i <br /> Crip ek&Victor Gold Mining m z W <br /> Corr m m <br /> TRI08 100 N 3rtl St2 4 2018 00 <br /> o Z <br /> Da!V�t ( 1 0 N <br /> I � FETY O/V <br /> September 20,2018 c <br /> o <br /> M' <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED <br /> 7017 2400 0000 4077 9576 <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources n <br /> Division of Reclamation,Mining and Safety 3 <br /> Office of Mined Land Reclamationco <br /> a o <br /> 1313 Sherman Street,Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244, Cripple Creek& Victor Gold Mining Company; Cresson Project; <br /> TR 108— Aregua Gulch Phase I Sump 108— Gulch Phase I Sump Implementation <br /> Dear Mr. Cazier: <br /> Newmont Mining Corporation - Cripple Creek and Victor Gold Mining Company (CC&V) hereby <br /> provides the Division of Reclamation, Mining and Safety (Division) Technical Revision (TR) No.108 <br /> requesting a modification to better manage solution chemistry in order to achieve higher recovery at the <br /> Arequa Gulch(AG)Processing Facilities. <br /> Background: <br /> CC&V is proposing the following modification options in order to improve gold recovery at the AG <br /> Valley Leach Facility (VLF) and Absorption Desorption Recovery (ADR). Figure 1 details the current <br /> process solution flow. <br /> Modifications to the Modifications to the Approved Mine Plan: <br /> Plan: <br /> CC&V proposes to implement the following four modifications to the AGVLF, AGADR and Pregnant <br /> Solution Enhancement System (PSES) Facilities. Pending approval, all modifications will be on lined <br /> facilities and all piping additions will be steel or high-density polyethylene(HDPE)material. <br /> Pregnant Leach solution from Phase II will be pumped via pipe on liner and collected in a used, <br /> repurposed CAT 777 haul truck bed, which will function as a sump. Figure 2 details the lined location of <br /> the truck bed,which will be on the southwest side of the Phase I Pregnant Pumps. <br /> A lime slurry will be added to the truck bed to promote scaling when combined with the Phase II solution; <br /> precipitating the lime and ore to the bottom of the truck bed sump. The lime slurry will be pumped via <br /> 1 <br />