My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-21_REVISION - M2007058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007058
>
2018-09-21_REVISION - M2007058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:40:40 AM
Creation date
9/21/2018 1:15:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007058
IBM Index Class Name
REVISION
Doc Date
9/21/2018
Doc Name
Request for Technical Revision
From
C&B Sand & Gravel
To
DRMS
Type & Sequence
TR1
Email Name
ACY
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The hydrologic balance issue has been addressed previously in Site Description (c), and items(i)and (j) <br /> above. A stable configuration will be accomplished by the 3:1 back slopping of the pit faces on the west and <br /> northwest sides of the pit area into the more sheer rock high-walls. <br /> (m) Specify whether the deposit will be processed on-site. <br /> As stated in (e)4 above, there are plans to provide for a generator/control building and portable crusher or <br /> screening plant to process material at this site. All material will be handled onsite using tracked excavators <br /> bulldozers and front-end loaders to temporarily stockpile and load to haul trucks. Material stockpiles may be <br /> produced and reduced on a daily basis or will be conveniently located adjacent to or on land owned by <br /> owner which is next to the active mine pit areas as excavation activities proceed. One storage shed will be <br /> on proposed site. Hydro carbons will be stored in storage shed.There will be fuel storage tanks on site with <br /> proper secondary containment structures. <br /> (n) Primary and secondary commodities to be mixed/extracted and intended use. <br /> The primary commodities to be mined onsite will be large boulders, rock, and crushed rock for sand and <br /> gravel and backfill soil. The intended use of these materials will be as river stabilization boulders, structural <br /> rip-rap, crushed rock and road gravel base course and fill material for road construction activities.There are <br /> no secondary commodities to be minded and/or extracted at this site. <br /> (o) Incidental products to be mined and/or extracted. <br /> There are no incidental products to be mined and/or extracted by the proposed operations <br /> (p) Blasting <br /> Blasting will be used to loosen rock so it may be moved with tracked excavators, bulldozers and front-end <br /> loaders.An outside third part will be hired for blasting. <br /> On recommendation by Division of Reclamation Mining and Safety the geotechnical stability exhibit will not <br /> be required because of the location and type of rock. <br />
The URL can be used to link to this page
Your browser does not support the video tag.