Laserfiche WebLink
Colowyo Coal Company, L. P. <br />Permit No. 95MF1040 <br />Issuance 7 <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />ATTACHMENT B <br />PARTICULATE EMISSIONS CONTROL PLAN FOR MINING ACTIVITIES <br />THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR <br />COMPLIANCE PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY <br />THE AIR QUALITY CONTROL COMMISSION REGULATION NO.1, Section III.D.1.b. THIS SOURCE IS <br />SUBJECT TO THE FOLLOWING EMISSION GUIDELINES: <br />a. Mining Activities - Visible emissions not to exceed 20% opacity, no off -property transport of <br />visible emissions. <br />b. Haul Roads - No off -property transport of visible emissions shall apply to on-site haul roads, the <br />nuisance guidelines shall apply to off-site haul roads. <br />C. Haul Trucks - There shall be no off -property transport of visible emissions from haul trucks when <br />operating on the property of the owner or operator. There shall be no off -vehicle transport of <br />visible emissions from the material in the haul trucks when operating off of the property of the <br />owner or operator. <br />Control Measures <br />1. Adequate soil moisture must be maintained in topsoil and overburden to control emissions during <br />removal. Watering shall be implemented if necessary. <br />2. Topsoil stockpiles shall be compacted and revegetated within one year of placement. <br />3. Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by watering <br />at all times unless natural moisture is sufficient to control emissions. <br />4. Unpaved haul roads shall be treated with chemical stabilizer per manufacturer's recommendations <br />and watered as often as needed to control fugitive particulate emissions. <br />5. Reclamation works and sequential extraction of material shall be initiated to keep the total disturbed <br />areas at any one time to a minimum. <br />6. Coal stockpiles shall be treated with chemical crusting agents and watered as needed to control <br />fugitive particulate emissions. <br />7. Drilling of overburden for blasting, shall employ hoods and water spray units. Coal drilling shall utilize <br />deflector plates to localize particle distribution around each drill hole. <br />8. Sequential blasting shall be implemented for particulate reduction. No blasting shall take place when <br />wind speeds exceed 30 MPH. <br />AIRS ID: 081/0007 & 103/0327/001 Page 21 of 22 <br />