Laserfiche WebLink
RULE 2 PERMITS <br />Shops, Warehouse Facility, Change/Production Facility <br />Colowyo maintains several shops, a warehouse facility, and change production building at the <br />operation covering approximately 30 acres in S34, T4N, R93W. <br />Mechanical repair work on the mobile mining equipment fleet is performed at the shop facility and <br />in the field. A welding facility and tire bay is also a part of the shop facility. The warehouse <br />contains an inventory of equipment parts for use in the comprehensive maintenance program. The <br />warehouse yard also provides storage of the larger parts due to limited covered building space. <br />Employees use the change facility/production building in this location before and after their shift <br />to change either into their work clothes or back into their street clothing. Shower facilities are <br />provided in the change complex. Additional structures in the complex include a diesel fueling and <br />gasoline fueling station for both the large mobile mine equipment and the mine pickup truck fleet, <br />a tank farm building and numerous above ground storage tanks.. Mobile equipment and employee <br />parking areas are also provided at the complex. Several coal stockpile areas as shown on Map 22A <br />are found near the shop facility to provide for temporary storage of the coal. A reclamation storage <br />building, sign storage building, potable water treatment plant, powder magazines, and a temporary <br />hazardous waste storage facility are also located in this area. <br />Drainage from the shop and warehouse complex is collected as shown on the Map 12 and 12A <br />This structure has been designed as shown under the Ponds, Impoundments and Diversions Section <br />of 2.05.3. <br />Laboratory, Production Office. Personnel Offices and Chance Room Facility <br />Colowyo maintains a multi-purpose facility covering approximately 2 acres in Section 34, <br />Township 4 North, Range 93 West. This facility contains two structures as shown on the Existing <br />Structures - South Map (Map 22). <br />Coal analysis is performed in the- laboratory portion of the larger structure. Production crews have <br />locker, shower, and toilet -facilities provided in part of the larger structure. The remainder of the <br />larger structure is used for training, safety, crew assembly, and production management offices. <br />The smaller structure contains offices for the Human Resources Department. Included in this area <br />is a paved parking lot used for all production and maintenance personnel based in the area and <br />some company owned small vehicles. <br />Drainage from this area is collected as shown on Map 12 — Hydrology - South Map and Map 12A <br />Gossard and Mine Maintenance Areas. <br />Crushing and Loadout Facilities <br />The coal crushing and loadout facilities include four separate facilities: (1) primary crusher; (2) <br />secondary crusher and train loadout; (3) stoker coal crusher; and (4) stoker loadout siding. <br />The primary crusher facility is located in Section 3, Township 3 North, Range 93 West, as shown <br />on the Existing Structures - South Map (Map 22). Included in the primary crusher facility are a <br />Rule 2 Permits 2.05-7 Revision Date: 5/25/18 <br />Revision No.: RN -07 <br />