My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_PERMIT FILE - C1981019A (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-07-09_PERMIT FILE - C1981019A (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 7:59:39 AM
Creation date
9/21/2018 8:07:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/9/2018
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />To support the proposed post -mining land use, small water impoundments (stock tanks) will be <br />constructed to encourage an even distribution of grazing animals over the reclaimed site and to <br />enhance the areas for wildlife. These small impoundments will also replace the existing water <br />rights associated with the stock ponds that existed pre -mining. If necessary, Colowyo will submit <br />designs for these small impoundments to the Division prior to their construction. <br />Also, to provide access in the area for ranching purposes, the access road from Highway 13 will <br />be left in place after mining is complete, and a number of "ranch roads" will be provided on the <br />reclaimed area to approximate the roads that were in the area before mining. The access road <br />will be narrowed from 26 to 12 feet, the asphalt removed, sideslopes reduced to 4:1 and the sides <br />revegetated. <br />The consideration of rangeland as a post -mining land use is identical to the discussion in Section <br />2.04.3. The limitations on changing to an alternative land use are fully discussed in that Section. <br />Domestic livestock grazing will not commence until at least three years after seeding and shall <br />be managed to promote the post -mining land use. Grazing will be managed in such a manner so <br />as to not interfere or preclude the post -mining vegetation sampling as required in Section 4.15.8. <br />Rule 2 Permits 2.05-42 Revision Date: 5/25/18 <br />Revision No.: RN -07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.