My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_PERMIT FILE - C1981019A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-07-09_PERMIT FILE - C1981019A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 10:33:44 AM
Creation date
9/20/2018 11:48:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/9/2018
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATIONS AND RECLAMATION PLAN.......................................1 <br />2.05.1 OBJECTIVES.............................................................................................................................................. 1 <br />2.05.2 OPERATION PLAN - ESTIMATED AREA FOR LIFE OF OPERATION.............................................................. 1 <br />2.05.3 OPERATION PLAN - PERMIT AREA PRODUCTION METHODS AND EQUIPMENT ......................................... 1 <br />2.05.4 RECLAMATION PLAN.............................................................................................................................. 19 <br />2.05.5 POST -MINING LAND USES......................................................................................................................41 <br />2.05.6 MITIGATION OF SURFACE MINING OPERATION IMPACTS.......................................................................43 <br />2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES......................................................1 <br />2.06.1 <br />SCOPE.......................................................................................................................................................1 <br />2.06.2 <br />EXPERIMENTAL PRACTICES MINING........................................................................................................ <br />1 <br />2.06.3 <br />MOUNTAINTOP REMOVAL MINING...........................................................................................................6 <br />2.06.4 <br />STEEP SLOPE MINING...............................................................................................................................6 <br />2.06.5 <br />PERMITS INCORPORATING VARIANCES FROM APPROXIMATE ORIGINAL CONTOUR RESTORATION <br />REQUIREMENTS FOR STEEP SLOPE MINING...............................................................................................................6 <br />2.06.6 <br />PRIME FARMLANDS.................................................................................................................................. <br />6 <br />2.06.7 <br />VARIANCES FOR DELAY IN CONTEMPRANEOUS RECLAMATION REQUIREMENTS IN COMBINED SURFACE <br />ANDUNDERGROUND MINING OPERATIONS............................................................................................................... <br />6 <br />2.06.8 <br />SURFACE COAL MINING AND RECLAMATION OPERATIONS ON AREAS OR ADJACENT TO AREAS <br />INCLUDINGALLUVIAL VALLEY FLOORS...................................................................................................................6 <br />2.06.9 <br />AUGERING AND HIGHWALL MINING......................................................................................................10 <br />2.06.10 <br />COAL PROCESSING PLANS AND SUPPORT FACILITIES NOT LOCATED WITHIN THE PERMIT AREA.......... <br />11 <br />2.06.11 <br />IN-SITU PROCESSING ACTIVITY............................................................................................................. <br />11 <br />RULE 2 MISCELLANEOUS REQUIREMENTS...................................................................................................1 <br />2.07 PUBLIC PARTICIPATION AND APPROVAL OF PERMIT APPLICATIONS........................................1 <br />2.08 PERMIT REVIEWS, REVISIONS AND RENEWALS, AND TRANSFER, SALE AND ASSIGNMENT <br />2.10 MAPS AND PLANS - GENERAL REQUIREMENTS................................................................................... I <br />RULE 3 PERFORMANCE BOND REQUIREMENTS..........................................................................................1 <br />RULE 4 PERFORMANCE STANDARDS...............................................................................................................1 <br />4.01 GENERAL PROVISIONS....................................................................................................................................... 1 <br />4.0 1.1 SCOPE AND OBJECTIVES..................................................................................................................................1 <br />4.02 SIGNS AND MARKERS...............................................................................................................................1 <br />4.02.1 SPECIFICATIONS....................................................................................................................................... 1 <br />4.02.2 MINE AND PERMIT IDENTIFICATION SIGNS............................................................................................... 1 <br />4.02.3 PERIMETER MARKERS.............................................................................................................................. 1 <br />4.02.4 DURATION OF MAINTENANCE.................................................................................................................. 2 <br />4.02.5 STREAM BUFFER ZONE MARKERS............................................................................................................2 <br />4.02.6 BLASTING SIGNS......................................................................................................................................2 <br />4.02.7 TOPSOIL MARKERS.................................................................................................................................. 2 <br />4.03 ROADS............................................................................................................................................................2 <br />4.03.1 HAUL ROADS...........................................................................................................................................2 <br />4.03.2 ACCESS ROADS........................................................................................................................................ 5 <br />4.03.3 LIGHT -USE ROADS...................................................................................................................................5 <br />4.04 SUPPORT FACILITIES...............................................................................................................................6 <br />4.05 HYDROLOGIC BALANCE.........................................................................................................................7 <br />4.05.1 GENERAL REQUIREMENTS........................................................................................................................7 <br />4.05.2 WATER QUALITY STANDARDS AND EFFLUENT LIMITATIONS................................................................... 8 <br />Table of Contents ii Date Revised: 5/25/18 <br />Revision No: RN -07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.