Laserfiche WebLink
Table L-1 Phase 2 Reclamation Task and Cost Estimate <br /> Activity Description Time(Months) Cost($) <br /> Remove truck scale 0.5 3000 <br /> Active highwall backfilling 1 24000 <br /> Topsoilings of all disturbed areas 1 45375 <br /> Revegetation of disturbed areas. Includes seeding and mulching. 2 21250 <br /> Subtotal 4 $93,625 <br /> DRMS Costs(28%x direct costs) $26,215 <br /> Total Bond Amount $119,840 <br /> The total bond for the Robinsons Sons Gravel Pit No. 1 will be $1 l 9,840. <br /> Robinson Gravel No 1 <br /> September 2018 L-2 <br />