My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-08_REVISION - M2018016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018016
>
2018-09-08_REVISION - M2018016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:56:40 AM
Creation date
9/18/2018 2:50:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018016
IBM Index Class Name
Revision
Doc Date
9/8/2018
Doc Name
Request For Amendment To Permit
From
Empire Aggregates
To
DRMS
Type & Sequence
AM1
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Mining Timetable <br /> The following timetable is a best estimate of the sequence of operations for the life of the mine <br /> after April 2018. Estimates are based on mining and selling 1 million tons of total product per <br /> year: <br /> Table D-1 Mining Timetable <br /> Description Mining Time Material Quantity <br /> Initial mining of the site.Production 2018-2020 1500000 Tons <br /> ramp up as the pit comes online. <br /> Mining and reclamation under full 2020-2029 9000000 Tons <br /> operation. Mining proceeds north <br /> and west from the initial cut in the <br /> southeast corner of the site <br /> Final reclamation of the site. 2029-2031 4000000 Tons <br /> Revegetation of last portions of <br /> disturbed ground and removal of all <br /> portable equipment from the site. <br /> Two years of vegetation monitoring <br /> prior to release of bond. <br /> Total 20 Years 10,500,000 Tons <br /> The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br /> mining is undertaken. Note: If large contracts are awarded to the site, production could increase <br /> to the permit maximum, thereby curtailing the life of the pit. On the other hand, if contracts are <br /> less than anticipated, the life of the pit could be extended. This table is based on a reasonable <br /> projection of average production rates. <br /> No phasing is planned for this operation. Once mining in the initial area has reached full depth, <br /> mining will then progress outward to the north and to the west. Map C-2A shows a snapshot of <br /> the operation at what is estimated to be the five year mark. Map C-213 shows the site fully mined <br /> out. <br /> 3. Mine Facilities and Operation <br /> The site will contain the below listed facilities. Where applicable, it is noted if a facility is <br /> portable and whether it will have any fuel storage associated with it. <br /> DMR Greg 1—icki and Ax iatm VIA A' <br /> September 2018 D-4 <br />