My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-18_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2018-09-18_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 4:27:56 AM
Creation date
9/18/2018 2:45:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
9/18/2018
Doc Name
Water Level Monitoring
From
Battle Mountain
To
DRMS
Annual Report Year
2018
Report Quarter_Month
Aug
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation Date ft ft ft <br /> P6 08/30/2018 72.46 DRY N/A <br /> P7 08/30/2018 92.50 92.29 0.21 <br /> P8 08/30/2018 97.51 96.60 0.91 <br /> P9 08/30/2018 72.30 71.96 0.34 <br /> P10 08/30/2018 58.30 57.57 0.73 <br /> I'll 08/30/2018 41.80 41.38 0.42 <br /> P12 08/30/2018 41.71 41.68 0.03 <br /> P13 08/30/2018 41.34 41.03 0.31 <br /> P14 08/30/2018 41.24 DRY N/A <br /> P15 08/30/2018 41.10 40.85 0.25 <br /> The leak detection system at the TSF Collection Pond was inspected August 30, 2018. A total of 860 <br /> gallons (28.7 GPD) were evacuated from the leak detection system and pumped to the LTF. The LTF <br /> underdrain system flow was measured to be approximately 34.0 gallons per minute(gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of August 2018, the West Pit Water Treatment Plant was operated under Colorado <br /> Department of Public Health and Environment(CDPHE)CDPS Permit No. C00045675 for discharge into <br /> the Rito Seco alluvial aquifer. During the month of August, 6,946,000 gallons (21.3 acre-feet) of treated <br /> water was discharged to the Rito Seco. There was 380,200 gallons (1.17 acre-feet) of water transferred <br /> from the West Pit to the LTF in August 2018. There was no sludge transferred from the water treatment <br /> plant drying pad to the LTF. <br /> BMRI performed the monthly visual seepage expression inspections on August 31, 2018 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area during August 2018. <br /> BMRI measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> ft <br /> BF-4 08/30/2018 24.89 <br /> BF-511 08/30/2018 30.79 <br /> BF-6 08/30/2018 30.90 <br /> M-6 08/30/2018 DRY <br /> M-7 08/30/2018 DRY <br /> M-8 08/30/2018 DRY <br /> M-9 08/30/2018 141.62 <br /> M-10 08/30/2018 26.30 <br /> M-11R 08/30/2018 39.04 <br /> M-12 08/30/2018 175.14 <br /> M-13R 08/30/2018 126.02 <br /> M-14 08/30/2018 131.13 <br /> M-15 08/30/2018 93.10 <br /> M-16 08/30/2018 23.20 <br /> M-17 08/30/2018 30.48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.