Laserfiche WebLink
APPLICATION INSTRUCTIONS <br /> i <br /> It is the a1212licants'fight to receive ct decision on their Cpltlplele 411dication 1111thin 30 <br /> days. The applicants are fi-ee to choose whichdvet• oI)tio31 they decide is best. <br /> Permittee and ProspectNe Tuccessor must tlesignatle their decision oil the attached <br /> A1q)UC.Cttion form. <br /> I <br /> Demonstration of Legal Right to I+:nter:All Permittecs must provide a description of <br /> the basis for legal right of entry to the site and to conduct mining and reclarriation. See <br /> Hard Rock and Construction Materials Rules 6.3.7 and 6.4.14. To comply with this <br /> requirement, the Prospective Successor must demonstrate that he/slie/it has obtained a <br /> legal right of entry from any and all surface and mineral tights owners in the affected <br /> lands,independent of the current Permittee. See I IardjRock and Construction Materials <br /> Rules 6.3.7, 6.4.14, and 1.6.2(l)(e)(i). This may be ' copy of an access lease, deed, <br /> abstract of title, current tax receipt, or a signed and n tarized statement by the pi-operty <br /> owners stating that the Prospective Successor has a le al right to enter. See liarc ock <br /> and Construction Materials Rule 6.3.7. <br /> b Structure Agreements: In many cases, operators mu t provide the Division copies of <br /> g 1 <br /> agreements to compensate the owners of any significa it,valuable, and permanent nlan- <br /> made structures and utilities within 200 feet o. the affected land ("Structure <br /> Agreements'). See bard Rock Rules 6.3.12 and 6.4. 0; Construction Materials Rules <br /> 6.3.12 and 6.4.19. If the Permittee was required to provide Structure Agreements, the <br /> Prospective Successor must obtain neii, Structure A*reements from each owner and <br /> provide copies of the sane to the Division with the Application. <br /> Application Review 1roee$s <br /> The Division will grant an Application if it finds that all required information has been <br /> submitted, that the Prospective Successor is capable of assuming all responsibility for original <br /> permit by virtue of acceptable performance and Financial Wa•ranties, and that the Prospective <br /> Successor leas no outstanding violations. .S".ee. C.R.S. §§ 34- 2-119 and 34-32.5-119. If the <br /> Division does not act within 30 days from the date that a com lete Application has been filed, <br /> the Application will be considered automatically approved. . ee Hard Rock and Construction <br /> °r Materials Rule 1.12.1(2). If an Application is de ivi nied,the D ion Neill notify the Permittee and <br /> Prospective Successor no later than 10 days from the date ' renders its decision. Both the <br /> Permittee and Prospective Successor may appeal a denial, of Application to the Board by <br /> submitting a written request for an administrative appeal hoari g to the Board within 30 days of <br /> final decision date. ,See Hard Rock and Construction Materials Roe IA.11. <br /> i <br /> I <br /> -3 - <br />