My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-18_PERMIT FILE - M2018048
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018048
>
2018-09-18_PERMIT FILE - M2018048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:49:51 AM
Creation date
9/18/2018 2:33:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018048
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2018
Doc Name
Adequacy Review Response
From
SEMA Construction
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subcontract#: 061804-017 <br /> Page 19/Rev 171204 <br /> c) Conduct a walk-through with Contractor to identify Work area limits, access or hauling <br /> restrictions, potential impacts to water quality, and other potential environmental impacts. <br /> 5.3 Hazardous Environmental Conditions: Subcontractor shall immediately notify Contractor in <br /> writing if it discovers or creates a hazardous environmental condition at the Work site, such as <br /> asbestos, petroleum, PCBs or other hazardous materials. Subcontractor shall stop all Work in the <br /> area of the Hazardous Environmental Condition, shall secure or otherwise isolate the condition if <br /> possible, and shall document the condition as soon as possible after discovery or creation. <br /> 5.4 Incident and Inspection Reporting: Subcontractor shall immediately report to Contractor any <br /> environmental incidents, such as spills (regardless of quantity), discharge of pollutants, damage to <br /> environmental control measures, significant materials tracked-out onto roadways, or significant dust <br /> events. Subcontractor shall immediately report to Contractor the presence of any local, state, or <br /> federal compliance inspectors at the Work site. <br /> 5.5 Environmental Conditions: If Contractor, in its sole reasonable discretion, deems any part of <br /> Subcontractor's Work to create an unacceptable risk of harm to the environment or to humans, <br /> Contractor may order Subcontractor, its employee(s), or subordinate contractors, to stop Work in the <br /> affected area until Subcontractor takes corrective actions satisfactory to Contractor. Subcontractor <br /> shall submit a corrective action plan with procedures to mitigate environmental incidents at <br /> Contractor's written request and within the timeframe set by Contractor. If Subcontractor fails to take <br /> such corrective action, Contractor may do so and deduct the cost from payments due the <br /> Subcontractor. <br /> 5.6 Compliance With All Environmental Laws: Subcontractor shall have primary responsibility <br /> with respect to its Work to comply with all federal, state, and local statutes, ordinances, rules, and <br /> regulations relating to the environment. <br /> 6. AGREEMENT TERMINATION <br /> 6.1 Default: Subcontractor shall be in "Default" of this Agreement if Contractor determines that it: <br /> a) Fails to supply the labor, materials, equipment, supervision and other things required of it in <br /> sufficient quantities and of sufficient quality to perform the Work with the skill, conformity, <br /> promptness and diligence required; <br /> b) Causes stoppage or delay of or interference with the Work; <br /> c) Becomes financially unstable; or <br /> d) Fails in the performance or observance of any of the covenants, conditions, or other terms of <br /> this Agreement. <br /> 6.2 Remedies in Case of Default: Contractor shall, after giving Subcontractor <br /> written notice of Default, have the right to exercise any one or more of the <br /> following remedies: <br /> a) Require that Subcontractor utilize, at its own expense, overtime labor, including Saturday and <br /> Sunday work, and additional shifts as necessary to overcome the consequence of any delay <br /> attributable to Subcontractor's Default; <br /> Equal Opportunity/Affirmative Action Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.