My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-14_REVISION - M1981279
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981279
>
2018-09-14_REVISION - M1981279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 4:13:39 AM
Creation date
9/17/2018 2:02:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981279
IBM Index Class Name
REVISION
Doc Date
9/14/2018
Doc Name
Request for Technical Revision
From
All Rite Paving & Redi-Mix
To
DRMS
Type & Sequence
TR2
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o�.cow <br /> * COLORADO DIVISION OF RECLAMATION, MINING Aftorp <br /> N <br /> 1876 <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> EIT I _U 18 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHELOSIONOFRE <br /> 1-1,�W <br /> File No.: M- 1 981 -279 site Name:Hancock Pit MINING,gNp <br /> County ote ro TR# (DBMS Use onl <br /> 3 Cn <br /> Permittee:All Rite Paving and Redi Mix, Inc. <br /> (D <br /> " z <br /> 0 <br /> Operator(If Other than Permittee): C 3 <br /> CD <br /> Permittee Representative:J o d i Schreiber TR2 <br /> 'o 3 <br /> Please provide a brief description of the proposed revision: n <br /> O <br /> We would like to increase the maximum allowed disturbed area from the current 20 acre limit n <br /> to 50 acres. <br /> rr <br /> (<1 <br /> nn <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application m.o ...1 <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or IX <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted a o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 I Oc, 111, 112 construction Elmaterials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.