My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-08_PERMIT FILE - C1982056 (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2018-08-08_PERMIT FILE - C1982056 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 9:53:54 AM
Creation date
9/17/2018 9:53:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
8/8/2018
Doc Name
Exploration Drilling Information
Section_Exhibit Name
Exhibit 52 Exploration Drilling Information
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Form No. OFFICE OF THE STATE ENGINEER <br />GWS -25 COLORADO DIVISION OF WATER RESOURCES <br />818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />(303) 866 -3581 <br />APPLICANT <br />TWENTYMILE COAL LLC <br />29515 RCR 27 <br />OAK CREEK, CO 80467- <br />(970) 870 -2712 <br />WELL PERMIT NUMBER 295535 - - <br />DIV. 6 WD 57 DES. BASIN MD <br />APPROVED WELL LOCATION <br />ROUTT COUNTY <br />SE 1/4 NW 1/4 Section 13 <br />Township 5 N Range 86 W Sixth P.M. <br />DISTANCES FROM SECTION LINES <br />2000 Ft. from North Section Line <br />2060 Ft. from West Section Line <br />LIC <br />UTM COORDINATES (Meters.Zone:13,NAD83) <br />CGJUI ly. <br />ivorining: <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that <br />no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. <br />2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402 -2, unless approval of a variance has <br />been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. <br />3) Approved pursuant to CRS 37- 92- 602(3)(b)(1) for uses as described in CRS 37- 92- 602(1)(0. Use of this well is limited to monitoring water levels <br />and /or water quality sampling. This well was acknowledged for construction is known as 14- 008AWC. <br />4) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. The well must be <br />kept capped and locked at all times except during sampling or measuring. <br />5) Records of water level measurements and water quality analyses shall be maintained by the well owner and submitted to the Division of <br />Water Resources upon request. <br />6) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 16 of the Water Well Construction <br />Rules. A Well Abandonment Report must be completed and submitted to the Division of Water Resources within 60 days of plugging. <br />7) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, and shall take <br />necessary means and precautions to preserve these markings. <br />8) This well must be constructed by or under the supervision of a licensed well driller or other authorized individual according to the Water Well <br />Construction Rules. If non - standard construction is anticipated, a variance request must be submitted in accordance with Rule 18 and approved <br />prior to well construction. <br />9) A Well Construction and Test Report (Form GWS -31), including lithologic log must be submitted by the individual authorized to construct the <br />well. For non - standard construction, the report must include an as -built drawing showing details such as depth, casing, perforated zones, and a <br />description of the grouting type and interval. <br />10) This well shall be constructed not more than 200 feet from the location specified on this permit. <br />11) The old well constructed under permit no. 294936 must be plugged in accordance with Rule 16 of the Water Well Construction Rules within <br />ninety-one (91) days of completion of the new well. The enclosed Well Abandonment Report form must be completed and submitted to affirm <br />that the old well was plugged. <br />NOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future permit. Additionally, <br />pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes constructed pursuant to a monitoring hole notice <br />shall not be converted to a production well. (Upon obtaining a permit from the State Engineer, a monitoring hole may be converted to a <br />monitoring well, recovery well for remediation of the aquifer, or a dewatering system for dewatering the aquifer.) <br />Ar E-7_8. <y <br />,PPROVED <br />AOT <br />State Engineer <br />In <br />TE ISSUED 08 -2 <br />By <br />EXPIRATION DATE 08 -28 -2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.