Laserfiche WebLink
Table 2 <br />SEDIMENTATION POND E DESIGN CALCULATIONS <br />(Continued) <br />Modified Universal Scil Loss Equation: <br />Y = 95 (Q gp) 0.56 K LS CP <br />= 95 ((1.42) (15.4)) 0.56 (0.2)(2.80)(1.0)(1.0) <br />- 299 tons x 2000 (lbs/ton) / 60 (lbs/cu.ft.)/43,560(sq. ft/ac.) <br />= 0.23 ac -ft. <br />Required Sediment Volume: 0.23 ac -ft x (100/40) = 0.58 ac.ft. <br />Required Sediment Cleanout: When pond is 60% full of sediment. <br />RUNOFF VOLUME: <br />1.8 in. rainfall and Curve Number 81 = 0.48 in. runoff <br />35.5 ac watershed x 0.48 (in. runoff)/12(in./ft.) = 1.42 ac -ft of runoff <br />volume <br />OPERATIONS VOLUME: <br />300 gallons per day = 40 ft3 = .00092 ac -ft <br />300 gal X 1 ft3 / 7.48 gal = 40 ft3 <br />40 ft3 / 43,560 (ft/acre) _ .00092 acre-feet <br />SPOIL SPRING FLOW: <br />.02 cfs = .0397 ac -ft <br />.02 cfs x 3600 sec/hr x 24 hr = 1728 ft3 <br />1728 ft3 / 43,560 (ft/acre) = .0397 ac -ft <br />TOTAL VOLUME: <br />0.58 ac -ft of sediment volume + 1.42 ac -ft of runoff volume + .00092 ac -ft <br />operations volume + .0397 ac -ft spoil spring flow = 2.04 ac -ft <br />of total volume <br />EMERGENCY SPILLWAY: <br />- Design for 25 -yr, 24 -hr event = 2.2 in. rainfall <br />- 35.5 ac watershed <br />- AMC II Curve No. 81 <br />- Average slope of runoff area is 6% <br />- Slope correction factor = 1.11 <br />- 2.2 in. rainfall O curve No. 81 = 0.74 in. runoff <br />PEAK FLOW: <br />32 cfs/in. runoff x 0.74 in. runoff x 1.11 = 26.3 cfs <br />- 8-9 - Revised 10/19/88 <br />