Laserfiche WebLink
o. r►asvc�aces. inn, <br />Getty Fuels <br />.CATION South Routt County, CO <br />DAa.Y DIARY <br />PROJECT NO. 83-414. <br />REPORT NO. 4 <br />DATE 5-16-83 <br />ME 2.0 hours <br />WRCE Dam Berm SAWU NO. 2 ENGIZYEERING TECHNICIAN F. W. <br />MORK PERMRb4M <br />The contractor placed several feet of fill in the berm since last tested on <br />MUAL INSTRU=()NS <br />Joe Tyburski was notified of the high moisture readings in the two tests <br />taken. <br />EMAPMS <br />Two compaction tests were taken on the Northern half of the berm. There was <br />not enough new fill on the Southern portion of the berm to be tested. <br />Both compaction tests met the required 90Z density called for in the specs. <br />The moisture in both tests were quite high. I think the high readings could <br />be atributable to the gauges reaction to small quantities of coal and organics <br />found in the fill material. The material appeared to be 3Z to 4Z over optimum. <br />