My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-08_PERMIT FILE - C1982056 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2018-08-08_PERMIT FILE - C1982056 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 9:30:14 AM
Creation date
9/17/2018 9:25:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
8/8/2018
Section_Exhibit Name
EXHIBIT 08 TAB 1 SEDIMENT CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED <br />7/30/85 <br />Runoff parameters and watershed characteristics were utilized in <br />deriving total runoff and peak flow rates for each sub -watershed, using <br />the methods outlined in Procedures for Determining Peak Flows in <br />Colorado (SCS, 1977). Total runoff was used to design impoundment <br />structures; peak flow rates were used to design diversion ditches, <br />culverts and outlet works. <br />Sedimentation Parameters <br />The established design criteria for drainage and sediment control <br />facilities is the amount of runoff resulting from 10 -year, 24-hour <br />precipitation event. Therefore, the sediment storage capacity of a <br />sedimentation pond should be adequate to store the volume of sediment <br />generated by a 10 -year, 24-hour precipitation event at all times. The <br />method of determining this volume is to calculate the total runoff and <br />peak flow for the desion event and insert these values in the Modified <br />Universal Soil Loss Equation (MUSLE). This method is described in <br />Applied Hydrology And Sedimentology For Disturbed Areas (Barfield, <br />Warner and Haan, 1981, pp. 365-380). The sediment yield thus derived is <br />the minimum allowable storage volume of the pond. Since the permanent <br />pool area must be cleaned out when it is 60 percent full of sediment, <br />the storage capacity is calculated by multiplying the 10 -year, 24-hour <br />sediment yield times 100/40. Thus, even when the perr.anent pool is 60 <br />percent full of sediment, there is adequate capacity to contain and <br />treat the 10 -year, 24-hour event. This method was applied to Pond E and <br />the detention basin at the Fish Creek Tipple. <br />SEDIMENT CONTROL FACILITIES <br />Sedimentation Pond E <br />The design of Pond E and associated ditches and culverts was approved by <br />the CMLRD under a Technical Revision to Permit 76-16 on March 18, 1983. <br />The pond is located in the southwest quarter of Section 2, Township 5 <br />North, Range 86 West, and receives drainage from the Tipple No. 3 <br />facilities. Tributary disturbed area is 24 acres; tributary undisturbed <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.