Laserfiche WebLink
VOLUME II -B <br />LIST OF EXHIBITS <br />8 Sediment Control Plan <br />8A Proposed Dewatering Facility Culvert Sizing <br />8B EMD Vent Fan Site SAE <br />8C EMD Dewatering Facility SAE <br />8C 1 EMD Treatment Pond Design <br />8D Escape Shaft/Light-Duty Road Culvert Design <br />8E Pond E Design <br />8E1 8 Right & 7 Right Cross -Panel Grout Operations Pad SAE <br />8E1(a) Corral SAE 10 year/24 hour <br />8F CYCC Pond B — Stage Storage — Estimated <br />8G Sedimentation Pond C: Design and certification <br />8H Hydrologic Evaluation of Sedimentation Ponds: A, and D and G <br />8H1 Montgomery Watson Evaluation of Pond D, 1999 <br />8H2 Pond D modifications (TR07-59) <br />8I Sedimentation Pond F: Design and Certification <br />81 CYCC Pond G — Stage Storage <br />8K CYCC Fish Creek Borehole Pond — Stage Storage <br />8L Drill Pad SAE <br />8M Refuse Disposal Pile Bench Channel <br />8N SEDCAD for Diversions: PDI, PD2, PD3, PD4 <br />8P Plate 1, Titled, "Sediment Ponds, Energy Mines No. 1 and No. 2 and Eckman Park" <br />8Q Sedimentation Ponds — Hydrologic Investigations and Ponds E, H and T Construction Verification <br />8R Fish Creek Culvert Design, NW Mains Ventilation Shaft, and Fish Creek Borehole Culverts <br />8S Certification — Pond E, Fish Creek Tipple, SAE Demonstration NW Mains Ventilation Shaft <br />8T 18 -Right Ventilation Intake Shaft SAE <br />8U Scoria Storage Area and Storage and Training Area SAE/ASC's <br />8V Area l Pit Water Storage Basin Impoundment Documentation <br />8W Thickener Overflow Sump Impoundment Documentation <br />8X 6 -North Mains Intake Shaft Drainage Designs <br />8Y 18 -Right Vent Shaft Access Road Topsoil Stockpile Diversion Ditches <br />8Z CYCC Office Building Drainage Design Documentation <br />8AA Haulroad A — Drainage Designs <br />8BB Washplant II Thickener Overflow Sump - Impoundment Documentation <br />8CC 6MN Mine Water Storage Reservoir — Drainage Designs <br />RN 17-07 viii 06/13/18 <br />