Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2017 <br />Peabody Saae Creek Mine C-2009-087 Peabody Sage Creek Minina, LLC. <br />Mine Name Permit # Permittee <br />Address: 29515 RCR27 Oak Creek, Colorado 80467 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date (March 31), as <br />agreed upon by the Division. It should include text, discussion, and maps, at a minimum, in addition to any <br />other reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report <br />Land Status Category <br />9 ry <br />Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Total acres disturbed <br />1844.0 <br />0 <br />1,844.0 <br />Re -disturbed acres <br />146.4 <br />0 <br />146.4 <br />Newly disturbed acres <br />68.8 <br />0 <br />68.8 <br />1,628.8 <br />Acres backfilled and graded <br />1,628.8 <br />0.0 <br />Acres topsoiled <br />1,628.8 <br />0.0 <br />1,628.8 <br />Seeding typically begins the minimum 10 -year liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br />*Include if necessary, a description of any augmented seeding or cultural practices (Note —"Cumulative <br />Totar adjusted to reflect Phase III bond release of 1,026 acres in 2015) <br />For the Entire Life of Mine, the total number of acres disturbed 1912.8 and the total number of acres - <br />Phase 1 released 1.725.0 Phase II released 1676.2 Phase III released 1094.8 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 68.8 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities' 68.8 <br />Acreage in active mining areas, 0_0 <br />'(exclude acres where Phase III release has been achieved) <br />2Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion <br />and collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and <br />construction areas; office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads: coal <br />conveyors; refuse piles and coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and <br />entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />Cumulative <br />This Calendar <br />Cumulative <br />10 Years or <br />Greater than <br />Total <br />Year <br />Total' <br />Less <br />10 Years <br />Acres Seeded` <br />1,628.8 <br />0.0 <br />602.8 <br />0.0 <br />602.8 <br />*Include if necessary, a description of any augmented seeding or cultural practices (Note —"Cumulative <br />Totar adjusted to reflect Phase III bond release of 1,026 acres in 2015) <br />For the Entire Life of Mine, the total number of acres disturbed 1912.8 and the total number of acres - <br />Phase 1 released 1.725.0 Phase II released 1676.2 Phase III released 1094.8 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 68.8 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities' 68.8 <br />Acreage in active mining areas, 0_0 <br />'(exclude acres where Phase III release has been achieved) <br />2Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion <br />and collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and <br />construction areas; office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads: coal <br />conveyors; refuse piles and coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and <br />entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />