Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date: August 11, 2018 <br /> S M T W T F S <br /> Temperature: Low: 52°F to High: 83°F Weather: Sunny <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Roxanne Li 6.5 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames assisted Comanco with repairs. <br /> 2.0 COMANCO ACTIVITIES <br /> Repairs including the geomembrane vents, were completed and vacuum tested. All repairs were <br /> performed in accordance with the Technical Specifications. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed geomembrane repairs during the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />