Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 28, 2018 <br /> S M T W T F S <br /> Temperature: Low: 48'F to High: 71°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 9 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill (DCF) Placement <br /> DCF material was delivered and stockpiled near the recertification area by mine operations <br /> traveling on at least 20-feet of geomembrane cover. The WA470 Komatsu loader continued to <br /> deliver the DCF material to the placement area on 9750' bench. A Cat 136T LGP dozer was used <br /> for deliver material placement by pushing up the slope on Panel PRC-26. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />