Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 27, 2018 <br /> S M T W T F S <br /> Temperature: Low:48°F to High: 65°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill (DCF) Placement <br /> The Mine operations continued today to deliver the DCF material and stockpiled near the <br /> recertification area traveling on at least 20-feet of geomembrane cover. The WA470 Komatsu <br /> loader was utilized to deliver the DCF material to the placement area on 9750' bench. A Cat D6T <br /> LGP dozer was used for delivered material placement by pushing up the slope on Panels PRC-24 <br /> and PRC-25. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> 9400 00 <br />