Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 26, 2018 <br /> S M T W T F S <br /> Temperature: Low: 47°F to High: 65°F Weather: Partly Cloudy/rain <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> The WA470 Komatsu loader continued to deliver the DCF to the placement area on 9750' bench. <br /> A Cat D6T LGP dozer was utilized for Drain Cover Fill (DCF) placement. It completed pushing up <br /> the slope between panels PRC-20 and PRC-25. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> No activities during the shift <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project re-shift safety meeting conducted b Ames <br /> p p J p Y g Y <br /> Construction. <br /> 9400 Station St,Lone Tree,Colorado 80124 <br />