Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number:475.0106.026 <br /> Date:July 25, 2018 <br /> S M T W T F S <br /> Temperature: Low: 43°F to High: 73°F Weather: Partly Cloudy/rain <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> The WA470 Komatsu loader was utilized to deliver the Drain Cover Fill (DCF) to the placement <br /> area on 9750' bench. A Cat D6T LGP dozer was used for DCF placement and was pushing up the <br /> slope between panels PRC-20 to PRC- 23. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />