Laserfiche WebLink
®NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number:475.0106.026 <br /> Date:July 21, 2018 <br /> S M T W T F S <br /> Temperature: Low: 52°F to High: 68°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 4 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> After geomembrane repairs were vacuum tested and approved, a CAT D6T LGP dozer was used <br /> to backfill the nuclear density test holes. <br /> 1.1 Drain Cover Fill Placement <br /> No activities during the shift. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Repairs <br /> Comanco performed geomembrane vacuum testing in accordance with the technical specifications and <br /> passing results. <br /> Comanco demobilized from site after the shift. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed test hole backfill, geomembrane vacuum testing, and approved <br /> geomembrane repairs during the shift. <br />