Laserfiche WebLink
Daily Report ■ <br /> VLF2 Geomembrane Recertification <br /> 475.0106.026 ■ <br /> July 20,2018 <br /> NewFields Activities <br /> NewFields personnel observed the test hole excavation, performed SLF nuclear density testing, <br /> and geomembrane repairs. SLF density testing was performed for the VLF2 Recertification area <br /> with passing results. <br /> 2.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> NewFields representatives Jay Moore and Nick Rocco were on site to observe the condition of <br /> the SLF, perform nuclear density testing of the recertification area SLF, and observe the <br /> geomembrane repairs. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br />