Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek &Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 17, 2018 <br /> S M T W T F S <br /> Temperature: Low: 50°F to High: 70°F Weather: Mostly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> The WA 470 Komatsu loader continued to deliver the DCF to the placement area on 9750' bench. <br /> A Cat 312C L excavator and CAT D6T LGP dozer were used for Drain Cover Fill (DCF) placement <br /> near Panels PRC-19 and 20. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Installation <br /> No work performed during the shift. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />