Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 13, 2018 <br /> S M T W T F S <br /> Temperature: Low: 48°F to High: 68°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 15 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> DCF material was delivered and stockpiled near the recertification area by mine operations <br /> traveling on at least 20-feet of geomembrane cover. The WA 470 Komatsu loader was used to <br /> deliver the DCF to the placement area on 9750' bench. A Cat D6T LGP dozer was used for Drain <br /> Cover Fill (DCF) placement and a finger was pushed up the slope of Panels PRC-17 and 18. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement. <br />