Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 12, 2018 <br /> S M T W T F S <br /> Temperature: Low: 50°F to High: 69°F Weather: Partly Cloudy/Rain <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 8 <br /> 1.0 AMES <br /> 2.0 CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> Mine Operations delivered Drain Cover Fill (DCF) from the stockpile to the loading area. The <br /> WA470 Komatsu loader was used to deliver the DCF to placement area on 9750' bench. A Cat <br /> D6T LGP dozer was used to place and pushed the material on 9750' bench. <br /> 2.1 Geomembrane Acceptance <br /> No activities during shift <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement. <br />