Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 11, 2018 <br /> S M T W T F S <br /> Temperature: Low:47°F to High: 70°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 12 <br /> 1.0 AMES <br /> 2.0 CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> Mine Operations continued to delivered Drain Cover Fill (DCF) from the stockpile to the loading <br /> area.The loader was utilized to deliver the DCF to placement area on 9750' bench.A Cat D6T LGP <br /> dozer was used to build the road on 9750' bench. <br /> 2.1 Geomembrane Acceptance <br /> No activities during shift <br /> 2.2 Geomembrane Installation <br /> Repairs were performed using the extrusion welding method.A total of 46 linear feet of extrusion <br /> seaming was completed. All repairs and extrusion welded seams were vacuum tested during the <br /> shift. All the destructive testing was performed and met project specifications. <br />