Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date: August 9, 2018 <br /> S M T W T F S <br /> Temperature: Low:44°F to High: 62°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer and a 312C L excavator were used to remove the Ore material on the 9850' <br /> bench at Northeast corner of Geomembrane Recertification VLF2 to find the damaged <br /> geomembrane. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> r3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />