My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:34:04 AM
Creation date
9/11/2018 4:28:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 2 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Record of Construction Report ■ <br /> VLF2 Recertification Project <br /> Subgrade and Geomembrane 9750'—9900'Elevations <br /> NewFields Project No.475.0106.026 <br /> August 17,2018 <br /> 3.3. Damaged Geomembrane Removal <br /> After the geomembrane was exposed and the damaged area was identified, it was removed using <br /> a CAT track mounted excavator. The removed geomembrane was discarded into roll off trash <br /> receptacles and removed from site. <br /> 3.4. Existing SLF Preparation <br /> Prior to geomembrane installation, the existing SLF depth was verified and the subgrade surface <br /> to receive geomembrane was compacted using a track mounted excavator with a smooth drum <br /> compactor attachment. The SLF was inspected and approved by Comanco, Ames and NewFields <br /> prior to geomembrane deployment. <br /> 3.4.1. SLF Testing <br /> Due to the existing SLF layer being intact and undisturbed, laboratory and density testing were <br /> not performed since the geomembrane liner was not damaged and it was tested and approved <br /> during Squaw Gulch Phase 1 VLF construction.The surface was proof rolled to ensure the surface <br /> met the requirements the Technical Specifications for geomembrane deployment. <br /> 3.4.1.1. SLF Depth Checks <br /> Depth checks were performed in accordance with the Technical Specifications to ensure that the <br /> SLF was not displaced in the VLF2 Recertification area between the 9750' and 9900' elevations. <br /> The depth check frequency for SLF is two tests for every acre. Two SLF depth checks were <br /> required. Four SLF depth checks were performed within the VLF2 Recertification area between <br /> the 9750' and 9900' elevations with passing results. SLF depth checks locations and results are <br /> shown on Drawing 1. <br /> 3.5. Geomembrane Installation <br /> Comanco installed approximately 71,851 square feet of 80 mil LLDPE DSMS geomembrane within <br /> the VLF2 Recertification between the 9750' and 9900' elevations. The recertification area <br /> certified in this report is shown on Drawing 2. Fork lifts were used to transport and deploy the <br /> geomembrane panels parallel to the slopes to minimize stress on seams. Double-wedge fusion <br /> welding was the primary method of geomembrane seaming. Extrusion welding methods were <br /> used to perform tie-in seaming, defect repairs and detail activities. Continuity conformance of <br /> fusion welded seams was performed using pressure testing methods, while extrusion welded <br /> seams and repairs were non-destructively tested using vacuum testing methods. Destructive <br /> testing was performed for both seaming types. The CQA Monitor observed and documented all <br /> Page 6 <br />